 4,What items Handbag Manufacturer| Leather Handbag| Leather Handbag Manufacturer should be paid attention to while showing off and using safely?  
A: ( 1) The safety belt rope that the scaffolder used is limited in 1.5-2 meters long.  ( 2) Should make, hang vertically, high to hang low to spend;

Regard as the horizontal level and hang it while using, should pay attention to swinging and colliding; It should not be low to hang and use high;

Should not restrict and tie and use; In case that cut off after the knot receives strength; Should not sew with large stitches and hang the firm thing

directly and hang on the nonmetal rope directly, prevent the rope from being cut off.
5,What shoes is homework of height forbidden wearing?
A: Forbid, wear hard bottom and area nail apt slippery shoes.
6,Can not it be engaged in the homework of height that what disease person suffered from?
A: All suffer from to hypertension, heart disease, anaemia, epileptics and other persons not suitable for homework disease in the height, can't be

engaged in the homework of height.
7,How to make good use of the security "  Triratna " ?
A: ( 1) Enter construction site, must put on, accord with the standard safety helmet, fasten the hatband;  ( 2) All unsettled homework personnel,

must hang the  Fashion Handbag Manufacturer| Pet Carrier Leather handbags good safety belt first in above 2 m.  ( 3 ) Hang dense eye safety net outside the scaffold, lift well every 2 set up lines of safety net

through l 0m at most.
8th, does the national standard stipulate what three permanent signs of the safety helmet are?  
A: ( 1 ) Factory's name and trade mark, type;  ( 2 ) Make the annual, moon;  ( 3 ) Licence serial number.

9th, what does height homework mean?  
A: High basis 2 that all falling  Mi the above (  Includes 2 meters) The homework carried on in height that probably falls, is called the homework

of height.
10th, when the height is 15 meters, as how much rice is the radius that fall?

A: 3 meters.
11th, what safeguard procedures should homework of entrance to a cave be taken?  '  
A: ( 1) All 1. 5 point * 1 meters. The hole under 5 meters, bury the open long reinforcing bar network or add the fixed apron in advance.
 ( 2) 1.5m * 1. The entrance to a cave 5m the above-mentioned, must set up two and protect oneself in the railing all around, one sets up safe flat

network under the entrance to a cave.
 ( 3) Lift well head set up guard rail or fixed bar door, lift well every two set up safety net through 10 m at most.  
 ( 4) Set up logistics company| Overseas Removal| Moving company| Moving services| Worldwide Relocation the safe protection canopy in passway top of the construction site.  
12th, at the construction site of the public place, what facilities must be set up?
A: Must set up the distinguishing mark and security fence facility. 
13th, which kinds of colors is the security which the country stipulate?
A: The safe is: Red, blue, yellow, green.
1 4, what kind of climatic conditions forbid open-air height homework?
A: Above- sixth -class gale, the thunder or torrential rain, wind and snow and fog it forbid the homework of open-air height.
Which components makes up 15, safety helmet?  
A: Cap shell, the cap is lined with, the lower chin is taken.

16, go on, drip construct, drip invite establishment place of pan, how much rice at least from road that pedestrian come and go?   
A: 5 meters.
17th, in order to prevent reserving the accident of falling of hole, on the entrance to a cave reserved in concrete floor, what measure should be

taken?
A: Must set up the firm apron, guard rail, safety net or other safeguard procedures of defending falling.
18th, it is tight in time limit, under the heavy situation of the task, only if the electrician personnel can wire by oneself, right?   
A: No.

19th, construction was hit "  Face the side five times "  What does it mean?
A: " face the side five times "  Point: Install balcony perimeter of railing yet, have other shelf protect aspect perimeter, frame project floor

perimeter  Freight Logistic Services| Ocean Transportation| Air Freight Forwarder| Office Relocation , runways upper and lower and by both sides of dishes oblique,unload by material the sides of the platforms.
What requirements 20, wear the safety helmet to have?
A: 1st, the safety helmet is lined with making up with two parts of cap shell by the cap, the cap can't stick to the cap shell closely to line with, there

should be certain interval, when there are supplies to fall on the safety helmet shell, the cap can play a role in buffering to line with, do not make

the cervical vertebra injured. 2, necessary bolt put Hubei Province to take closely, when the human body falls, because the safety helmet is worn

on the head, play a getting to the protection of the head role.  
21st, what measure should the dangerous area of construction site take at night?  
A: Should set up the red light and warn.   
22, ascend a height homework, use what tool should pay attention to?   
A: Ascend a height tool that the homework used, will put in the toolbox or tool bag, the commonly used tool should be taking with oneself,

necessary material  Handmade Bracelets| Imitation Jewelry| Wholesale Picture Frames| Beaded Bracelets| Butterfly Brooches or other tools, must transmit with the firm and durable rope, forbid throwing back and forth with hands, so as not to drop and

hurt one's feeling, after the homework, the tools used should be checked and regained, prevented leaving over and dropping and hurting one's

feeling at the homework scene.  
23rd, in the course of installing in the building, if two stories carry on the work at the same time, what measure must be taken, just allow workers

to work below of the same perpendicular line?

A: There  Unique Handcrafted Jewelry| Heart Necklace| Handmade Earrings| Handmade Jewelry| Beaded Necklaces| Hair Brush must be special-purpose shelter boards or other segregation measures between two stories.